Master bath remodel


The original master bath

Master Bath

The first thing to go was the old master bathroom shower. It had a drop ceiling that was only about 2 inches taller than I am.

Try

Try2

Added bracing to strengthen the floor and hopefully avoid any squeaks.

Try3

New sub-floor and Hardie backer installed

Try4

The exhaust pipe for the furnace and hot water heater had to be moved back 6 inches to accommodate the larger shower. Then we removed the back wall of the shower and extended it into the hall closet to create a 48″x48″ shower.

Try5

New plumbing and pipes sweat in and new sheet rock on the wall.

20160605_180941

20160605_211107

New sheet rock ceiling to fix the old saggy one.

Try6


Opening the old 26″ wide entry door to a 30″ wide.

Try7 Try8

Rough mock of the Hardie backer in the shower.

1

Pre-slope poured, liner installed, and drain set.

2

Final slope poured, ready for tile!

4

Finally found the right vanity and top

3

Paint finished!

20160812_225953

Last of the Hardie backer is up!

20160831_214746

Redgard finished, time for tile!

wp-1472870222649.jpg

Floor tile in

Ceiling tile in and holding strong

wp-1483478476162.jpg

Wall tile going up (thanks to pops)

Shower is finally done!

Floor tile down

Shower finished

Glass door installed

Finished vanity and top